Rail users can blame over-running engineering works and faulty trains rather than the snow for delays and two train cancellations this morning.
Greater Anglia, which operates rail services across the East of England, had warned commuters travelling between Norwich and Cambridge to expect delays, although the line is now fully operational.
Engineering works at Attleborough were the cause of the hold up.
The 7.14am service from Ipswich to Felixstowe, due at 7.40am, and the 7.47am Felixstowe to Ipswich, due at 8.14am, have been cancelled due to a fault with the train.
A series of minor delays reported by the rail operator can be found on the Greater Anglia website.
Greater Anglia, which operates rail services across the East of England, had warned commuters travelling between Norwich and Cambridge to expect delays, although the line is now fully operational.
Engineering works at Attleborough were the cause of the hold up.
The 7.14am service from Ipswich to Felixstowe, due at 7.40am, and the 7.47am Felixstowe to Ipswich, due at 8.14am, have been cancelled due to a fault with the train.
A series of minor delays reported by the rail operator can be found on the Greater Anglia website.